Li-FT Power Hits 26m at 1.29% Lithium and Extends BIG East Open at Depth
Li-FT Power's Yellowknife Lithium drill results deliver high-grade intercepts up to 26m at 1.29% Li2O at BIG East, with mineralisation confirmed open at depth and along strike across 1.8 km of pegmatite corridor.
Key Takeaways
- Li-FT Power's 20-hole, 5,324-metre drill programme at Yellowknife Lithium returned intercepts consistently above 1.0% Li2O across BIG East, Fi Main, and Ki pegmatites, confirming grade continuity across the project.
- BIG East's best hole — YLP-0312 — delivered 26m at 1.29% Li2O including 17m at 1.65% Li2O, with the pegmatite system confirmed open to the south and at depth beyond 200 metres below surface.
- Three 2025 summer holes at Fi Main and Ki were drilled for geotechnical strength testing, a direct precursor to feasibility-stage mine design, while also returning high-grade assay results.
- The BIG East pegmatite complex extends at least 1.8 km of strike length and ranges 10–100 metres wide, with open mineralisation at both southern and depth extents flagging clear targets for future resource growth.
- Yellowknife Lithium Project's proximity to road access, hydroelectric power, and Yellowknife airport distinguishes it from remote Canadian lithium projects and supports a lower-cost development pathway.
This is a special feature video produced for our partner.
Topic Hubs